ERECTING A 6 TONNE BRIDGE
- Rail mounted SRS vehicle loads onto 2 rail mounted SRS trailers
- Same truck hauls 3 miles to erection site
- SRS 750 tonne metre crane lifts bridge to final position
Bridge manufacturer, Barhale Ltd employed SRS Rail System Ltd both to transport and to lift this 6 tonne replacement bridge into its final position near the town of Iron Horse.
Barhale Ltd delivered the bridge to railway sidings at a nearby Power Station where an SRS crane lifted it onto two SRS rail trailers.
These were hauled the final 3 miles down the track by a 25 tonne SRS road rail truck....