Rapid Deployment
with Materials

LORRIES ON THE ROAD

Movement to site by road is quicker and easier than by rail.
Special routing is not necessary.

TRAVEL ON TRACK

Rail wheels negotiate railway track in the same way as trains eliminating problems with points, check rails etc.

Fast deployment to site – up to 45mph (72kph) – forward and reverse.

EASY ON TRACKING

Mounting the track at a level crossing usually takes less than 5 minutes and can be carried out UNDER LIVE OVERHEAD WIRES.

LIGHTWEIGHT MATS

For mounting on level ballast where there is no permanent crossing.

LOW LOADERS ARE NOT REQUIRED

Trans-Shipment at Track
Access Point Is Eliminated

1